Server Lift Streamlines the Operation of Data Centers

 Reviews




Taking care of the datacenter is a very important task and should be done carefully for optimal success

The data center contains several electrical devices, software, and applications that must be updated, but the task of upgrading servers may be one of the most challenging jobs. Not only is the work difficult, but may be dangerous as well for the people lifting the equipment. Fortunately, a simple solution does exist that can make the server deployment process less difficult. The best solution addresses the deployment process by creating a more efficient and safe environment within the datacenter.

It is common for IT technicians to take part in the deployment process by manually lifting the servers, which leads to a great deal of time being wasted on work that has the potential to end in an accident. However, technologies that assist with these sorts of projects have been greatly increasing, which makes it unnecessary to lift the servers or any other rack mountable equipment manually. Today, data center technicians who are deploying heavy servers can overexert themselves, however the new technologies simplify these tasks by assisting the workers with all the lifting.

This new technology is a server lift and is certainly a smart investment for any datacenter facility. Below are two important features that a server lifter needs to have to ensure success in the data center.

The server lift needs to have a smaller footprint to be able to move through the data center corridors and should also be sufficiently small for storage.

Data centers are likely to be designed with limited space, meaning they’re going to have constrained aisles and pathways between server racks. To have the capacity to move comfortably through most standard sized datacenter pathways, the perfect server lift will need to have a width of 24 inches. A smaller width will give the piece of equipment the capability to easily maneuver amongst the datacenter facility. In addition, the small size of the unit will enable the data center workers to store the server lift in small storage areas, and this is very important because space is restricted in the data center.


(adsbygoogle = window.adsbygoogle || []).push({});

The ideal server lift should be capable of lifting 500 lbs to a height of eight feet.

Clearly, the servers and other rack mountable equipment can be quite heavy. Therefore, a server lift must have the power to handle heavy equipment such as servers, uninterruptible power supplies, and batteries and lift them to the correct height to position into the racks.

To many people, both of these elements are obvious and basic. However, they are crucial as they bring numerous benefits. An automated server lift removes the majority of the difficulties linked to the server deployment process by doing the work that is usually performed by one or more individuals. One of the benefits is that the server lift will help reduce the risk of injuries in the lower back, which are usually caused when overexerting oneself.

There are many technical products readily available for the data center today to perform better, such as batteries and UPS’s, but the server lift is one of the most important investments a company will make. Datacenters can be quite overwhelming with regard to maintenance, but the server lift was designed particularly for the datacenter to tackle these challenges.






Source by Simon Bancroft

Author: 

Related Posts